Good condition and low operating hour 800 kWe / 400 V / 50 Hz combined heat and power (CHP) plant running on natural gas or biogas. The plant was delivered by MWM in 2011 and it operation was closed in 2021. Thermal energy is in form of hot water at 90°C used for district heating purpose

SKU: 9872024

Manufacturer
MWM GmbH
Manufacturer's type
CHP with s 2 x MWM TCG 2016 V08 C,
Made in year
2011
Capacity
2x400kWe + 2x395kWth at 90°C
Application
Combined heat and power production from biogas
GEN 1, Operating hours and Last Service
19442h, E50 service made in 2015
GEN 2, Operating hours and Last Service
11638h, E50 service made in 2016
Eletric production
2 x 400 kWe / 400 V / 50 Hz
Electrical efficiency
42.8% at generator poles
Therman power production
2 x 395 kWth at 90°C
Control system
TEAM Evo WMW
Control PLC
MWM DSL
NOx Emission
Max 500 mg/Nm3
Noice level
65 db (A) at 10 meters  
  • CHP Plant 800 kWe with 2 x MWM TCG 2016V08 Biogas Generators
  • CHP Plant 800 kWe with 2 x MWM TCG 2016V08 Biogas Generators
  • CHP Plant 800 kWe with 2 x MWM TCG 2016V08 Biogas Generators
  • CHP Plant 800 kWe with 2 x MWM TCG 2016V08 Biogas Generators
  • CHP Plant 800 kWe with 2 x MWM TCG 2016V08 Biogas Generators
  • CHP Plant 800 kWe with 2 x MWM TCG 2016V08 Biogas Generators
  • CHP Plant 800 kWe with 2 x MWM TCG 2016V08 Biogas Generators
  • CHP Plant 800 kWe with 2 x MWM TCG 2016V08 Biogas Generators
  • CHP Plant 800 kWe with 2 x MWM TCG 2016V08 Biogas Generators
  • CHP Plant 800 kWe with 2 x MWM TCG 2016V08 Biogas Generators
  • CHP Plant 800 kWe with 2 x MWM TCG 2016V08 Biogas Generators

CHP Power Plant 800 kWe with 2xMWM TCG 2016V08 Gas Gensets 

Good condition and low operating hour 800 kWe / 400 V / 50 Hz combined heat and power (CHP) plant running on natural gas or biogas. The plant was delivered by MWM in 2011 and it operation was closed in 2021. Thermal energy is in form of hot water at 90°C and currently used for district heating purpose. Due to the low amount of biogas, cogeneration plant worked at low capacity (30-40%), and not around the clock. It has a complete gas treatment and mixing system to utilize biogas from landfilling which has 40 – 55 % of CH4. Power generators are installed in two soundproof containers, TEAM Evo WMW power plant control system and all electric switches and control cabinets are installed in separate control room. Heat recovery system is built next to genset containers. Both units have separate cooling radiators for engine cooling in case of no heat load.

Main  Equipment:

  • Gas Engines 2 x MWM TCG 2016 V08 C, V8 Configuration, 1500 rpm, output 2x400 kWm
  • Generators  2 x Merelli MJB 355 MB4, 400 V / 50 hz, Cos fee 1.0, output 2 x400 kWe
  • Gas train, gas mixer, voltage stabiliser, power factor controller, control unit and switchboard
  • Exhaust silencer, exhaust gas heat exanger, engine cooling systems with plate heat exhangers for  pumps and radiator air-water coolers

Control cabinets, MMC cabinets, power switches