2010 - Wartsila 3.9 MW/50Hz Gas Generating Set 12V34SG with Auxiliaries

Low hours Wartsila 12V34SG with 10 bar steam boiler and other auxilliaries. Always serviced by Wartsila, total 43000 operating hours, last scheduled service was made just 3000-hour prior operation closing in 2021. This unit has modern Wartsila UNIC engine control system, all PLCs Siemens S7-series .

SKU: 9912024

Manufacturer
Wartsila Finland Oy
Manufacturer's type
W12V34SG Lean Burn Gas Engine
Made in year
2010
Capacity
3915 kWe / 50Hz
Application
Electric power and steam generation from natural gas
Operating hours since new   
43767
Alternator
ABB Synchronous Generator 5425 kVA
Electric power from alternator
3915 kWe / 6000V / 50Hz
Last schduled service
40000-hour service by Wartsila
Stem production at 100% load
Approx 2000 kW/10 bar saturated
Original heat rate (from alternator)
8188 kJ/kWhe (44.0 %)
Engine control system
UNIC + Siemens S7-series PLCs
Power transformer
SNT 6/15.7 kV, 6000 kVA (1994)
  • Generating Set Wartsila 12V34SG with CHP Auxilliaries
  • Generating Set Wartsila 12V34SG with CHP Auxilliaries
  • Generating Set Wartsila 12V34SG with CHP Auxilliaries
  • Generating Set Wartsila 12V34SG with CHP Auxilliaries
  • Generating Set Wartsila 12V34SG with CHP Auxilliaries
  • Generating Set Wartsila 12V34SG with CHP Auxilliaries
  • Generating Set Wartsila 12V34SG with CHP Auxilliaries
  • Generating Set Wartsila 12V34SG with CHP Auxilliaries
  • Generating Set Wartsila 12V34SG with CHP Auxilliaries
  • Generating Set Wartsila 12V34SG with CHP Auxilliaries
  • Generating Set Wartsila 12V34SG with CHP Auxilliaries
  • Generating Set Wartsila 12V34SG with CHP Auxilliaries
  • Generating Set Wartsila 12V34SG with CHP Auxilliaries
  • Generating Set Wartsila 12V34SG with CHP Auxilliaries

Wartsila 3.9 MW/50Hz Gas Generating Set 12V34SG with CHP Auxiliaries

This power plant was built by Wartsila in end of year 2010 and it was commissioned in 2011 as a turn-key project with heat recovery system for 10 bar steam production. Fuel used in this plant was normal natural gas fed from a local pipeline. The plant was operated till 2021 having total operating hours 43’767 till shutting down. Complete plant with step up transformer, lube oil system, control panels, and synchronizer panel, USP systems, operating monitors, MCC, start system and air compressors, HRCS for 10 bar steam, exhaust system, 6 kV Vacuum breaker with synchronisation, manuals and drawings. Plant is still installed, and electric power is still connected to all devices. Wartsila Service has made all scheduled services for this engine, last 40’000-hour service just 3000-hour prior operation closing in 2021. Note, that this unit has modern Wartsila UNIC engine control system, all PLCs Siemens S7-series